New floor DONE, a finished Quarter Log Cabin Quilt, Air Link flight.
from Elaine Adair Pieces
This is the last big project for the year. Old carpet finally GONE, and new vinyl flooring installed. This is the family room.
The is a small pass-thru area usually piled with "stuff". I need to find 2 strong men to slide the heavy cabinets 16 inches the other way, but I'm close to the end of this project. The plan is to add 1 area rug here, bright and graphic, to give the room color.
Here is the larger part of family room, needing a 2nd area rug.
A quilt photo ... this one is probably my favorite of ... read more